(1)
Workload Analysis of Production Workers at PT Mitra Maharta: Applying the NASA-TLX and Full-Time Equivalent Methods. IJEDR 2024, 5 (2), 1168-1178. https://doi.org/10.37385/ijedr.v5i2.5395.