[1]
“Workload Analysis of Production Workers at PT Mitra Maharta: Applying the NASA-TLX and Full-Time Equivalent Methods”, IJEDR, vol. 5, no. 2, pp. 1168–1178, Jun. 2024, doi: 10.37385/ijedr.v5i2.5395.