High Risk Factors of The Balikpapan RU-V RDMP Mega Project on Project Success

Authors

  • Ambarwaty Syahdiana Umar Universitas Diponegoro
  • Surya Raharja Universitas Diponegoro

DOI:

https://doi.org/10.37385/ijedr.v5i3.4787

Keywords:

Natural Risk, Design Risk, Resource Risk, Financial Risk, Legal and Regulatory Risk, Project Success

Abstract

A project's ability to manage risks and overcome challenges that arise during implementation can play a large role in determining its success. Project success can also be measured through the level of innovation implemented and operational efficiency achieved. This research aims to examine how natural risks, design risks, resource risks, financial risks, and legal and regulatory risks influence project success. The problem in this research is project quality problems which can result in delays in project implementation. The analysis method uses quantitative with multiple regression analysis techniques. Population of all employees on the Balikpapan RDMP Project. The sample was determined using purposive sampling, namely Leaders, Managers and Field Staff, totaling 66 employees. The research results show that the natural risk p-value is 0,000, resource risk p-value 0,044, and financial risk p-value 0.048 which means influentialsignificant negative impact on the success of the RU-V RDMP Balikpapan mega project, while the design risk p-value is 0,994and regulatory legal risk, the p-value of 0.674 has no effect on the success of mega projects.

References

Project Management Institute. (2008). A guide to the project management body of knowledge (PMBOK guide) (4th ed.). Project Management Institute.

Abd El-Razek, M. E., Bassioni, H. A., & Mobarak, A. M. (2008). Causes of delay in building construction projects in Egypt. Journal of Construction Engineering and Management, 134(11), 831–841.

Abrar, H. (2008). Manajemen proyek: Perencanaan, penjadwalan, dan pengendalian proyek. Andi.

Akbar, M. R., Subekti, A., & Dhani, M. R. (2018). Identifikasi bahaya dengan menggunakan metode FMEA pada mesin evaporator di pabrik gula. Seminar K3, 2(1), 779–782.

Project Management Institute. (2000). A guide to the project management body of knowledge (PMBOK guide). Project Management Institute.

Standards Australia. (1999). Risk management (AS/NZS 3460:1999). Standards Australia.

Chan, A. P. C., & Chan, D. W. M. (2022). Framework of success criteria for design/build projects. Journal of Managerial Engineering, 18(3), 120–128.

Cleland, D. I., & Ireland, L. R. (2002). Project management: Strategic design and implementation (4th ed.). McGraw-Hill.

Dipohusudo, I. (1996). Manajemen proyek dan konstruksi. Kanisius.

Kendrick, T. (2003). Identifying and managing project risk: Essential tools for failure-proofing your project. Amacom.

Kerzner, H. (1995). Project management: A systems approach to planning, scheduling, and controlling (6th ed.). John Wiley & Sons.

Kwak, Y. H. (2002). Critical success factors in international development project management. In CIB 10th International Symposium: Construction Innovation & Global Competitiveness (pp. 1–10). CIB.

Susilo, L. J., & Kaho, V. R. (2018). Manajemen risiko berbasis ISO 31000:2018. PT Gramedia Widiasarana Indonesia.

March, C., & Emmitt, S. (2016). Construction management: Principles and practice. John Wiley & Sons.

Nazir, M. (2005). Metode penelitian. Ghalia Indonesia.

Memon, A. H., Rahman, I. A., Aziz, A. A., V., K., Ravish, & Hanas, N. M. (2011). Identifying construction resources factors affecting construction cost: Case of Johor. In Malaysian Technical Universities International Conference on Engineering & Technology (pp. 1–10).

Parulian. (2021). Faktor penyebab risiko finansial terhadap tingkat keberhasilan proyek konstruksi. Prosiding Seminar Nasional Keinsinyuran, 1(1), 1–10.

Wideman, R. M. (1992). Project and program risk management: A guide to managing project risk and opportunities. Project Management Institute.

Ramli, S. (2013). Smart safety: Panduan penerapan SMK3 yang efektif. Andi.

Fitriani, R., & Nashar, J. U. (2021). Evaluasi manajemen risiko teknologi informasi berbasis ISO 31000:2018. Jurnal Nasional Indonesia, 2(1), 779–782.

Ronald, M. (2003). Manajemen pembangunan. Grafikatama Abdiwacana.

Sandyavitri, A., & Robert, J. Y. (2004). Risk management in water supply. In 30th WEDC International Conference, People and Systems for Water, Sanitation and Health (pp. 1–5). WEDC.

Saqib, M., Farooqi, R. U., & Lodi, S. H. (2008). Assessment of critical success factors for construction projects in Pakistan. In Proceedings of the International Conference on Construction in Developing Countries (ICCIDC-I) (pp. 1–10). ICCIDC.

Septiana, P. S. (2016). Manajemen risiko keselamatan dan kesehatan kerja pada proyek pembangunan apartemen venetian grand sungkono lagoon. Jurnal Teknik Sipil, 5(2), 95–105.

Spence, W. P. (2015). Construction materials, methods, and techniques (4th ed.). Cengage Learning.

Smith, N. J. (1991). Engineering project management. E & F Spon.

Sugiyono. (2012). Metode penelitian kuantitatif dan kualitatif. Alfabeta.

Sugiyono. (2003). Statistika untuk penelitian. Alfabeta.

Syaranamual, P., Tandean, P., & Chandra, H. P. (2022). Model faktor penyebab risiko terhadap keberhasilan proyek konstruksi. Jurnal Teknik Sipil, 11(2), 45–56.

Pertamina. (2021). Proyek pengembangan kilang (RDMP) Pertamina Balikpapan kejar target. Pertamina.com. Retrieved June, 2021, from https://www.pertamina.com

Zainal, A. (2007). Metodologi penelitian pada bidang ilmu komputer dan teknologi informasi: Konsep, teknik, dan aplikasi. Fakultas Ilmu Komputer, Universitas Indonesia.

Downloads

Published

2024-09-09

How to Cite

Umar, A. S. ., & Raharja, S. (2024). High Risk Factors of The Balikpapan RU-V RDMP Mega Project on Project Success. International Journal of Economics Development Research (IJEDR), 5(3), 2559–2577. https://doi.org/10.37385/ijedr.v5i3.4787